MyLoc8
GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Built-in SIM, 14-Day Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - 12-Mo Subscription Incl
GPS Tracker for Vehicles with Magnet – 4G LTE Real-Time Location Device with App, Built-in SIM, 14-Day Battery – Anti-Theft GPS Tracker for Car, Motorcycle, Scooter, Bike - 12-Mo Subscription Incl
Couldn't load pickup availability
Overview
- Brand : MYLOC8
- Special Feature : Alert Notification, Geo-Fence, Location History, Real Time Tracking, Weather Resistant
- Connectivity Technology : 4G, Bluetooth, Wi-Fi
- Supported Application : GPS (iOS, Android), Web Platform
- Specific Uses For Product : Commercial GPS Tracking, Vehicle GPS Tracking, Worldwide GPS Tracking
About this item
- Protect What Matters Most – Track your car, truck, or fleet in real time with our GPS tracker for vehicles. Get instant alerts on movement or unauthorized access, giving you peace of mind 24/7.
- Stay in Control, Anywhere – Using our free iOS & Android app, view precise live locations anytime. The built-in SIM offers reliable 4G LTE tracking with flexible subscription plans
- Discreet Yet Powerful – Our mini GPS tracker for vehicles is compact, waterproof (IP65), and easily hidden. Ideal as a car tracker device hidden from view for anti-theft protection
- No Tools Needed – Quick setup. Attach the device using strong magnets—no wiring, no hassle. Great for fleet tracking, teen drivers, or company vehicles
- Long-Lasting Peace of Mind – Track for up to 14 days on a single charge. This tracking device for cars ensures uninterrupted monitoring when it matters most
Share

Collections
-
Batteries & Accessories
At Gilead Drop, discover a premium selection of automotive batteries and accessories...
-
Body & Trim
Upgrade your vehicle’s appearance and functionality with Gilead Drop’s premium Body &...
-
Brake System
Upgrade your vehicle’s safety and performance with Gilead Drop’s Brake System collection,...
-
Bulbs & Indicators
Illuminate your drive with premium bulbs and indicators from Gilead Drop, designed...
-
Bumper Stickers
Elevate your vehicle’s style and personality with premium bumper stickers from Gilead...
-
Brake System
Upgrade your vehicle’s safety and performance with Gilead Drop’s Brake System collection,...
-
Cleaning Tools
Discover the perfect balance of efficiency and durability with Gilead Drop’s Cleaning...
Blog posts
View all-
2" Garage Door Springs Replacement Kit: Torsion...
This 2" Garage Door Spring Replacement Kit includes a left and right torsion spring for a complete garage door set.Each spring measures 0.207” steel wire diameter x 2” inside diameter...
2" Garage Door Springs Replacement Kit: Torsion...
This 2" Garage Door Spring Replacement Kit includes a left and right torsion spring for a complete garage door set.Each spring measures 0.207” steel wire diameter x 2” inside diameter...
-
12 x 10 FT Metal Garden Shed: Heavy-Duty Outdoo...
The Hipicute 12 x 10 FT Metal Garden Shed is a durable outdoor storage solution for backyard, patio, or garage use.Constructed with heavy-duty galvanized steel, it resists rust and withstands...
12 x 10 FT Metal Garden Shed: Heavy-Duty Outdoo...
The Hipicute 12 x 10 FT Metal Garden Shed is a durable outdoor storage solution for backyard, patio, or garage use.Constructed with heavy-duty galvanized steel, it resists rust and withstands...
-
Solar Bug Zapper Outdoor: Waterproof Cordless M...
The Solar Bug Zapper Outdoor by P PEST SNIPER is a practical and eco-friendly solution for mosquito control.Designed for outdoor use, this cordless and rechargeable mosquito zapper is ideal for...
Solar Bug Zapper Outdoor: Waterproof Cordless M...
The Solar Bug Zapper Outdoor by P PEST SNIPER is a practical and eco-friendly solution for mosquito control.Designed for outdoor use, this cordless and rechargeable mosquito zapper is ideal for...