SinoTrack
SinoTrack 4G GPS Tracker for Vehicles, ST-901L LTE Mini GPS Tracker Waterproof Locator Real-Time Location Device for Car Motorcycle Truck Taxi with No Monthly Fee Tracking System
SinoTrack 4G GPS Tracker for Vehicles, ST-901L LTE Mini GPS Tracker Waterproof Locator Real-Time Location Device for Car Motorcycle Truck Taxi with No Monthly Fee Tracking System
Couldn't load pickup availability
Overview
- Brand : SinoTrack
- Special Feature : Waterproof,Cut Engine Off,Real Time Tracking, Alert Notification, Geo-Fence, History Route Playback, Rechargeabl Waterproof,Cut Engine Off,Real Time Tracking, Alert Notification, Geo-Fence, History Route Playback, Rechargeabl
- Connectivity Technology : Cellular
- Supported Application : SinoTrackPRO
- Specific Uses For Product : for gps tracker car,car alarms,car Anti Lost Alarm tracker
About this item
- 【Cut Engine Remotely】4G gps tracker include relay, when you found your car was stolen, you can control your car remotely on your phone, cut the engine by sending SMS command, the vehicle will stop move until it received your SMS command “9400000”, prevent theft of your car on the parking lot.(the car running below to 20KM/h will stop within 10-20sec when it get sms command)
- 【MAIN FUNCTION & 4G NETWORK】SinoTrack mini car gps tracker for Motorbike, Built-in WCDMA, GSM and GPS double antennas with ACC to detect ignition.(SIM Card Not Include). ST-901L 4G(2G+4G)GPS tracker for vehicles, very simple and easy to use for Motorcycle, Truck, Taxi, etc.Text message alerts for movement, speeding, leaving or entering areas, low battery,Shocking, driving reports historical data saved during service. Real time gps vehicle tracker built-in backup battery
- 【SUPPORT TRACKING PLATFORM LIFETIME】Waterproof gps tracker for cars with online tracking service subscription. Buy a SIM card for the device (this GPS locator not include a SIM card, you need to buy another one), search sinotrackpro login or download Sinotrack Pro GPS APP from your tablet, pc or phone lifetime. Real-time tracking is available at no additional cost
- 【REAL TIME TRACKING】Real-time car GPS tracker ST-901L 4g gps tracker for vehicles hidden Locator based on LTE, GSM , GPRS network and GPS satellites ,locating and monitoring remote targets with our own GPS tracking APP or web, which display of location information accurately ( Positioning accuracy up to 10 meters )
- 【HISTORY MEMORY】Sinotrack 4g gps tracker for motorcycles,car,truck and taxi can save 2 years of tracking history. Sinotrack gps tracker no monthly fee with 2 time interval,You can view and play back your daily tracking history,and when the car goes to a place,you can make a clearer judgment.Attention Please:we recommend SpeedTalk SIM card,don't use T-mobile
Share

Collections
-
Batteries & Accessories
At Gilead Drop, discover a premium selection of automotive batteries and accessories...
-
Body & Trim
Upgrade your vehicle’s appearance and functionality with Gilead Drop’s premium Body &...
-
Brake System
Upgrade your vehicle’s safety and performance with Gilead Drop’s Brake System collection,...
-
Bulbs & Indicators
Illuminate your drive with premium bulbs and indicators from Gilead Drop, designed...
-
Bumper Stickers
Elevate your vehicle’s style and personality with premium bumper stickers from Gilead...
-
Brake System
Upgrade your vehicle’s safety and performance with Gilead Drop’s Brake System collection,...
-
Cleaning Tools
Discover the perfect balance of efficiency and durability with Gilead Drop’s Cleaning...
Blog posts
View all-
Vintage Metal Tin Street Sign Review – Retro Wa...
The RESTAURANT Non-Embossed Vintage Metal Tin Street Sign from Aeontinity offers a classic retro aesthetic perfect for adding character to any indoor or outdoor space. Measuring 3.94 inches tall and...
Vintage Metal Tin Street Sign Review – Retro Wa...
The RESTAURANT Non-Embossed Vintage Metal Tin Street Sign from Aeontinity offers a classic retro aesthetic perfect for adding character to any indoor or outdoor space. Measuring 3.94 inches tall and...
-
10x12 FT Metal Storage Shed Review – Heavy-Duty...
The 10x12 FT Metal Storage Shed from Reljofum is a spacious and durable outdoor solution designed to keep your garden tools, lawn equipment, and seasonal items organized. Built with reinforced...
10x12 FT Metal Storage Shed Review – Heavy-Duty...
The 10x12 FT Metal Storage Shed from Reljofum is a spacious and durable outdoor solution designed to keep your garden tools, lawn equipment, and seasonal items organized. Built with reinforced...
-
Omega 21" x 48" x 36" Freezer Starter Shelving ...
The Omega 3-Tier Freezer Starter Shelving Unit is a durable and professional-grade storage solution designed for commercial kitchens, restaurants, and food service environments. Measuring 21 inches deep, 48 inches wide,...
Omega 21" x 48" x 36" Freezer Starter Shelving ...
The Omega 3-Tier Freezer Starter Shelving Unit is a durable and professional-grade storage solution designed for commercial kitchens, restaurants, and food service environments. Measuring 21 inches deep, 48 inches wide,...